Fields: SHERYL (UPPER HOPE)
Cum Oil
11k BBL
Cum Gas
2k MCF
casinghead
Wells
1
Production
1994-03 — 2001-09
Peak Month
1994-09
Production History Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil: 11,409 BBL Cum Gas: 2,393 MCF
RRC production reported through Apr 2026 · recent months incomplete
Decline Curve Analysis
qi
818 BBL/mo
Di (annual)
175.0%
b-factor
0.4
EUR
9,190 BBL
R-squared
0.880
type
hyperbolic
Operator History (from monthly production reports)
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1B | 42-253-31033 | L.C.S. PRODUCTION COMPANY | 2 | 3,450 | 1994-01-27 |