Fields: ALYSSE (CANYON)
Cum Oil
3k BBL
Cum Gas
4k MCF
casinghead
Wells
1
Production
1994-05 — 1997-12
Peak Month
1994-06
Production History Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil: 3,429 BBL Cum Gas: 4,427 MCF
RRC production reported through Apr 2026 · recent months incomplete
Operator History (from monthly production reports)
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 2 | 42-151-32396 | SMITH PIPE OF ABILENE | 1 | 6,200 | 1994-03-17 |