KIRKHAM, D.J.

Oil · District 7C · Lease #10094

Operator: SMITH PIPE OF ABILENE

Cum Oil

20k BBL

Cum Gas

131 MCF

casinghead

Wells

3

Production

1993-01 — 2001-02

Peak Month

1994-09

Production History

Cum Oil: 19,839 BBL Cum Gas: 131 MCF

RRC production reported through Apr 2026 · recent months incomplete

Decline Curve Analysis

qi

572 BBL/mo

Di (annual)

63.1%

b-factor

0.0

EUR

10,851 BBL

R-squared

0.602

type

exponential

Operator History (from monthly production reports)

2001-03 — 2026-07 SMITH PIPE OF ABILENE 305 mo
1993-01 — 2001-02 CONE & PETREE OIL & GAS EXP. INC 98 mo

Wells (3)

WELL#APIOPERATORPERMITSDEPTHLAST_ISSUED
2SMITH PIPE OF ABILENE25,0001987-07-27
3SMITH PIPE OF ABILENE15,0001985-01-21
1SMITH PIPE OF ABILENE15,0001983-04-07