DEAN, C. R.

Oil · District 7C · Lease #10353

Operator: SMITH PIPE OF ABILENE

Cum Oil

35 BBL

Cum Gas

3 MCF

casinghead

Wells

1

Production

1993-01 — 1993-03

Peak Month

1993-02

Production History

Cum Oil: 35 BBL Cum Gas: 3 MCF

RRC production reported through Apr 2026 · recent months incomplete

Operator History (from monthly production reports)

1993-06 — 1993-10 SMITH PIPE OF ABILENE 5 mo
1993-01 — 1993-05 FRANKLIN, JACK 5 mo

Wells (1)

WELL#APIOPERATORPERMITSDEPTHLAST_ISSUED
1SMITH PIPE OF ABILENE15,1001983-10-14