Fields: T.W.P. (CROSS CUT SAND)
Cum Oil
7k BBL
Cum Gas
14k MCF
casinghead
Wells
1
Production
1993-01 — 1994-07
Peak Month
1993-03
Production History Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil: 6,917 BBL Cum Gas: 14,446 MCF
RRC production reported through Apr 2026 · recent months incomplete
Decline Curve Analysis
qi
805 BBL/mo
Di (annual)
237.4%
b-factor
0.9
EUR
16,504 BBL
R-squared
0.991
type
hyperbolic
Operator History (from monthly production reports)
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1 | 42-399-34193 | TKP PETROLEUM INC. | 1 | 4,500 | 1992-05-15 |