HARRIS, T. WAYNE

Oil · District 7C · Lease #9261

Operator: SMITH PIPE OF ABILENE

Cum Oil

0 BBL

Cum Gas

0 MCF

Wells

1

Production

1993-01 — 1993-09

Peak Month

1993-01

Production History

Cum Oil: 0 BBL Cum Gas: 0 MCF

RRC production reported through Apr 2026 · recent months incomplete

Operator History (from monthly production reports)

1993-02 — current SMITH PIPE OF ABILENE 8 mo
1993-01 — 1993-01 FOX OPERATING COMPANY 1 mo

Wells (1)

WELL#APIOPERATORPERMITSDEPTHLAST_ISSUED
7001SMITH PIPE OF ABILENE17,7001981-08-13