permit #462025
Drill // Final Completion-- lifecycle
1997-05-06 received
1997-05-29 issued
1997-06-19 spud
1997-06-19 surface_casing
1997-06-28 well_status
1997-09-04 final_update
1999-05-29 expired
| permit# | 462025 |
| sequence | 99 |
| type | Drill |
| api | 42-003-38208 |
| lease | FSAU (FULLERTON SAN ANDRES UNIT) |
| well# | 32X |
| depth | 4,900 ft |
| drill_type | Vertical |
| well_status | Final Completion |
| operator | DEVON ENERGY CORPORATION(NEVADA) |
| county | ANDREWS (3) |
| district | 10 |
| nearest_city | FRANKEL CITY (8.50 mi N) |
| surface_acres | 720.00 |