Permits
5
Max Depth
12,000 ft
First Permit
1980-07-15
Latest Activity
1984-03-26
Lifespan
4 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1980-12-23
Shut-In
—
Plugged
1984-06-28
Formation Tops (4) Elevation 20 ft (KB)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| FRIO G-3 (Frio) | 8,878 ft | -8,858 ft |
| FRIO 9100 (Frio) | 9,122 ft | -9,102 ft |
| FRIO J-1 (Frio) | 9,621 ft | -9,601 ft |
| FRIO J-4 (Frio) | 9,723 ft | -9,703 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (3)
| Interval | Type |
|---|---|
| 8,819–8,921 ft | Perforated |
| 9,123–9,128 ft | Perforated |
| 9,723–9,726 ft | Perforated |
Casing (5)
| Size | Set Depth | Cement |
|---|---|---|
| 16" | 148 ft | — |
| 10.75" | 2,495 ft | 1,330 sx |
| 2.375" | 8,925 ft | — |
| 7.625" | 9,089 ft | 625 sx |
| 2.375" | 9,569 ft | — |
Permit History (5)
TEXAS STATE TRACT 212 · 10,250 ft
1984-03-26
TEXAS STATE TRACT 212 · 9,770 ft
1983-07-20
TEXAS STATE TRACT 212 · 9,704 ft
1982-06-28
TEXAS STATE TRACT 212 · 9,770 ft
1982-04-12
TEXAS STATE TRACT 212 · 12,000 ft
1980-07-15
Spud 1980-08-28
Applications (5)
Records & Logs
4 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 12,000 ft
- Drill Type
- Vertical
- County
- ARANSAS
- District
- 4
- Operator
- GETTY OIL CO.
- Completed
- 1980-12-23
Operator
- Name
- GETTY OIL CO
- Location
- MIDLAND
- P-5 Status
- Inactive (filed 1989-03-27)
- Total Permits
- 1,564