42-009-34859

Final Completion

HERNDON A. B.

ARCHER County · District 9 · TAYLOR OPER. CO. · ARCHER COUNTY REGULAR

Permits

1

Max Depth

5,500 ft

First Permit

1980-12-05

Latest Activity

1980-12-05

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-08-05

Shut-In

Plugged

1982-04-15

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
4,970–4,980 ftPerforated

Casing (3)

SizeSet DepthCement
8.625"141 ft105 sx
1.5"5,047 ft
2.875"5,194 ft150 sx

Permit History (1)

Applications (1)

#101025 A TAYLOR OPER. CO.
received 1980-12-05

Records & Logs

1 completion filing on record.

W-2/G-1 1981-08-12

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in ARCHER County.

Well Details

Well Number
2
Max Depth
5,500 ft
Drill Type
Vertical
County
ARCHER
District
9
Completed
1981-08-05

Operator

Location
BRIDGEPORT
P-5 Status
Inactive (filed 1987-10-06)
Total Permits
264