Permits
1
Max Depth
5,900 ft
First Permit
1985-06-24
Latest Activity
1985-06-24
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-08-08
Shut-In
—
Plugged
1994-08-02
EWA / Production operator mismatch
Scheduling: CAYCE ENTERPRISES ≠ Production: M. E. OPERATING & SERVICES, INC. (reported 2001-12)
Resolved via: scheduling → CAYCE ENTERPRISES
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-07
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (3) Elevation 1,135 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| STRAWN | 4,490 ft | -3,355 ft |
| CADDO | 4,976 ft | -3,841 ft |
| MISSISSIPPIAN | 5,350 ft | -4,215 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 4,621–4,625 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 135 ft | 90 sx |
| 4.5" | 5,500 ft | 375 sx |
Permit History (1)
Applications (2)
Records & Logs
4 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 5,900 ft
- Drill Type
- Vertical
- County
- ARCHER
- District
- 9
- Operator
- CAYCE ENTERPRISES
- Completed
- 1985-08-08
Operator
- Name
- CAYCE ENTERPRISES
- Location
- FORT WORTH
- P-5 Status
- Inactive (filed 1991-06-18)
- Cum Oil (all leases)
- — bbl
- Cum Gas (all leases)
- — mcf
- Total Permits
- 30