42-009-40216

Final Completion

PALMER BOONE

ARCHER County · District 9 · HERRING RAY · DANA EAST (MISS)

Permits

1

Max Depth

5,600 ft

First Permit

1990-01-24

Latest Activity

1990-01-24

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1990-02-01

Shut-In

Plugged

2007-01-04

!

EWA / Permit operator mismatch

Scheduling: HERRING RAY ≠ Permit: PALMER, JOHN INC.

Resolved via: schedulingHERRING RAY

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2011-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (2)

CSV
FormationTop Depth (MD)
PALO PINTO 3,289 ft
CADDO 4,909 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. View filings & logs at RRC ↗

Casing (2)

SizeSet DepthCement
8.625"104 ft100 sx
4.5"5,231 ft240 sx

Permit History (1)

Applications (1)

#368963 A PALMER, JOHN INC.
received 1990-01-22

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 1990-02-26 log on file
W-2/G-1 1990-03-31

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in ARCHER County.

Well Details

Well Number
1
Max Depth
5,600 ft
Drill Type
Vertical
County
ARCHER
District
9
Operator
HERRING RAY
Completed
1990-02-01

Operator

Location
GRAHAM
P-5 Status
Inactive (filed 2013-04-18)
Cum Oil (all leases)
994,279 bbl
Cum Gas (all leases)
5,571,035 mcf
Total Permits
401