42-009-40811

Final Completion

NICHOLS

ARCHER County · District 9 · SKY DEVELOPMENT CORPORATION · MEGARGEL (CADDO)

Permits

1

Max Depth

5,200 ft

First Permit

1993-10-28

Latest Activity

1993-10-28

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1993-11-23

Shut-In

Plugged

1998-01-29

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1998-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (2)

CSV
FormationTop Depth (MD)
PALO PINTO 3,048 ft
CADDO 4,620 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. View filings & logs at RRC ↗

Perforations (1)

IntervalType
4,620–4,645 ftOpen hole

Casing (2)

SizeSet DepthCement
8.625"130 ft100 sx
5.5"4,618 ft180 sx

Permit History (1)

Applications (1)

#417553 A SKY DEVELOPMENT CORPORATION
received 1993-10-27

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 1993-12-17 log on file
W-2/G-1 1993-12-28

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in ARCHER County.

Well Details

Well Number
3
Max Depth
5,200 ft
Drill Type
Vertical
County
ARCHER
District
9
Completed
1993-11-23

Operator

Location
GRAHAM
P-5 Status
Inactive (filed 2002-07-16)
Cum Oil (all leases)
135,260 bbl
Cum Gas (all leases)
3,100,454 mcf
Total Permits
25