42-023-30777
Final CompletionHARGRAVE-PORTWOOD F
BAYLOR County · District 7 · SMITH PIPE OF ABILENE · HONEY BEE (MISSISSIPPIAN)
Permits
1
Max Depth
5,300 ft
First Permit
1981-07-13
Latest Activity
1981-07-13
Lifespan
< 1 yr
-- operator_history
originally filed by CHITAL PETROLEUM CORP. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Well Details
- Well Number
- 2
- Max Depth
- 5,300 ft
- Drill Type
- Vertical
- County
- BAYLOR
- District
- 7
- Operator
- SMITH PIPE OF ABILENE