Permits
2
Max Depth
3,702 ft
First Permit
1987-02-05
Latest Activity
1989-05-08
Lifespan
2 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1987-03-26
Shut-In
—
Plugged
2000-09-21
EWA / Production operator mismatch
Scheduling: E. K. O. ≠ Production: KEBO OIL & GAS, INC. (reported 1996-10)
Resolved via: scheduling → E. K. O.
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2000-09
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (1) Elevation 348 ft (KB)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| VICKSBURG | 2,435 ft | -2,087 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (4)
| Interval | Type |
|---|---|
| 2,782–2,786 ft | Perforated |
| 2,886–2,888 ft | Perforated |
| 2,891–2,894 ft | Perforated |
| 2,897–2,903 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 374 ft | 158 sx |
| 4.5" | 3,115 ft | 700 sx |
Permit History (2)
Applications (2)
Records & Logs
4 completion filings on record · 2 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet