42-029-32961

Final Completion

GUERRA SOLOMON

BEXAR County · District 1 · TOPAZ ENERGY INC. · SHAW

RRC Lookup

Permits

1

Max Depth

1,600 ft

First Permit

1983-04-04

Latest Activity

1983-04-04

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1983-04-19

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: TOPAZ ENERGY INC. ≠ Production: KOKO SKADI, LLC (reported 2025-12)

Resolved via: productionKOKO SKADI, LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#191923 A TOPAZ ENERGY, INC.
received 1983-04-04

Well Details

Well Number
1
Max Depth
1,600 ft
Drill Type
Vertical
County
BEXAR
District
1
Completed
1983-04-19

Operator

Location
MIDLAND
P-5 Status
Y (filed 1991-10-09)
Total Permits
24

External Links

Live © 2026 Petrora