42-029-34706

Final Completion

PAPE LOUIS P.

BEXAR County · District 1 · RAINER ENERGY INC. · VON ORMY

Permits

1

Max Depth

1,700 ft

First Permit

1983-12-23

Latest Activity

1983-12-23

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-02-20

Shut-In

Plugged

2005-04-12

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
1,240–1,260 ftPerforated

Casing (1)

SizeSet DepthCement
4.5"1,774 ft212 sx

Permit History (1)

Applications (1)

#224694 A RAINER ENERGY, INC.
received 1983-12-23

Records & Logs

4 completion filings on record.

W-2/G-1 1984-02-24
W-2/G-1 1986-01-25
W-2/G-1 1984-02-24
W-2/G-1 1984-02-24

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in BEXAR County.

Well Details

Well Number
3
Max Depth
1,700 ft
Drill Type
Vertical
County
BEXAR
District
1
Completed
1984-02-20

Operator

Location
WEATHERFORD
P-5 Status
Delinquent (filed 2002-02-11)
Cum Oil (all leases)
31,431 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
18