Permits
1
Max Depth
1,600 ft
First Permit
1986-03-14
Latest Activity
1986-03-14
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1991-04-01
Shut-In
—
Plugged
2004-05-24
EWA / Permit operator mismatch
Scheduling: FAR INC. ≠ Permit: MONROE WELL SERVICE, INC.
Resolved via: scheduling → FAR INC.
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-07
Operator History
originally filed by MONROE WELL SERVICE, INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (2)
CSV| Formation | Top Depth (MD) |
|---|---|
| OLMOS | 1,374 ft |
| OLMOS | 1,381 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 1,381–1,390 ft | Perforated |
Casing (1)
| Size | Set Depth | Cement |
|---|---|---|
| 4.5" | 1,455 ft | — |
Permit History (1)
Applications (1)
Records & Logs
3 completion filings on record · 1 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet