42-039-31194

GENERAL CRUDE PERSIMMON BAYOU

BRAZORIA County · District 3 · MOBIL PRODUCING TX. & N.M. INC. · RATTLESNAKE MOUND (7000)

Permits

1

Max Depth

7,800 ft

First Permit

1978-01-03

Latest Activity

1978-01-03

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

1983-10-03

!

EWA / Permit operator mismatch

Scheduling: MOBIL PRODUCING TX. & N.M. INC. ≠ Permit: GENERAL CRUDE OIL CO.

Resolved via: schedulingMOBIL PRODUCING TX. & N.M. INC.

Operator History

originally filed by GENERAL CRUDE OIL CO. — asset transferred

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Casing (3)

SizeSet DepthCement
9.625"1,200 ft500 sx
2.375"6,775 ft
5.5"7,154 ft325 sx

Permit History (1)

Applications (1)

#11447 A GENERAL CRUDE OIL CO.
received 1978-01-03

Records & Logs

1 completion filing on record.

W-2/G-1 1978-03-16

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in BRAZORIA County.

Well Details

Well Number
1
Max Depth
7,800 ft
Drill Type
Vertical
County
BRAZORIA
District
3

Operator

Location
SPRING
P-5 Status
Active (filed 2025-06-04)
Cum Oil (all leases)
181,898,111 bbl
Cum Gas (all leases)
1,950,074,148 mcf
Activities
CSGD/G, GTHS/C, GTHS/G
Total Permits
6,763