42-039-32167

Plug Dry Hole (P&A) Directional

OBIE HASTY OIL UNIT

BRAZORIA County · District 3 · WOODARD ENERGY COMPANY

Permits

2

Max Depth

8,300 ft

First Permit

1986-12-12

Latest Activity

1987-02-04

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

1987-02-26

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Permit History (2)

Applications (2)

#326158 A WOODARD ENERGY COMPANY
received 1987-02-04
#324306 A WOODARD ENERGY COMPANY
received 1986-12-12

Records & Logs

No W-2/G-1 filings on record in the RRC wellbore file for this well.

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in BRAZORIA County.

Well Details

Well Number
1
Max Depth
8,300 ft
Drill Type
Directional
County
BRAZORIA
District
3

Operator

Location
HOUSTON
P-5 Status
Inactive (filed 2013-02-05)
Cum Oil (all leases)
— bbl
Cum Gas (all leases)
50,626 mcf
Total Permits
11