Permits
2
Max Depth
7,100 ft
First Permit
1990-11-21
Latest Activity
1993-05-18
Lifespan
2 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
—
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2001-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (8) Elevation 26 ft (GL)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| DANBURY DOME | 1,985 ft | -1,959 ft |
| DANBURY DOME (2780) | 2,780 ft | -2,754 ft |
| DANBURY DOME (3580) | 3,580 ft | -3,554 ft |
| DANBURY DOME (3680) | 3,680 ft | -3,654 ft |
| DANBURY DOME (MIO-B-8) | 3,790 ft | -3,764 ft |
| DANBURY DOME (3900) | 3,900 ft | -3,874 ft |
| DANBURY DOME (5655 SD) | 5,708 ft | -5,682 ft |
| DANBURY DOME (5655 SAND) | 5,968 ft | -5,942 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (2)
| Interval | Type |
|---|---|
| 5,708–5,712 ft | Perforated |
| 5,968–5,980 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 1,157 ft | 585 sx |
| 5.5" | 6,109 ft | 400 sx |
| 5.5" | 6,147 ft | 400 sx |
Permit History (2)
Applications (2)
Records & Logs
3 completion filings on record · 1 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet