42-039-32486

Final Completion Directional

RANDALL-WHITON MIOCENE OIL UNIT

BRAZORIA County · District 3 · MW PETROLEUM CORPORATION · HASTINGS (M-14-A)

RRC Lookup

Permits

4

Max Depth

5,500 ft

First Permit

1993-02-26

Latest Activity

1997-02-04

Lifespan

4 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1993-03-31

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: MW PETROLEUM CORPORATION ≠ Production: TRI-UNION DEVELOPMENT CORP. (reported 1999-03)

Resolved via: schedulingMW PETROLEUM CORPORATION

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-04

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (4)

#458167 A MW PETROLEUM CORPORATION
received 1997-02-04
#420188 A MW PETROLEUM CORPORATION
received 1994-01-13
#409366 A MW PETROLEUM CORPORATION
received 1993-07-16
#409366 A MW PETROLEUM CORPORATION
received 1993-02-26

Well Details

Well Number
3
Max Depth
5,500 ft
Drill Type
Directional
County
BRAZORIA
District
3
Completed
1993-03-31

Operator

Location
HOUSTON
P-5 Status
Y (filed 1999-06-04)
Cum Oil (all leases)
25,493,833 bbl
Cum Gas (all leases)
77,041,527 mcf
Total Permits
364

External Links

Live © 2026 Petrora