42-041-30630
Final CompletionHARRISON OIL UNIT I
BRAZOS County · District 3 · MCZ INC. · BRYAN (WOODBINE)
Permits
1
Max Depth
8,800 ft
First Permit
1981-07-24
Latest Activity
1981-07-24
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1981-09-02
Shut-In
—
Plugged
2000-06-08
EWA / Production operator mismatch
Scheduling: MCZ INC. ≠ Production: B.W.O.C., INC. (reported 2002-06)
Resolved via: scheduling → MCZ INC.
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-07
Injection / Disposal
Permitted Volume
10,000 bbl/d
Max Pressure
5,000 psi
Injection Interval
8,360–8,370 ft
Injected (12mo)
—
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (5) Elevation 349 ft (KB)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| BASE WILCOX (Wilcox) | 4,495 ft | -4,146 ft |
| TOP CHALK | 8,005 ft | -7,656 ft |
| WOODBINE | 8,360 ft | -8,011 ft |
| BASE CHALK | 8,370 ft | -8,021 ft |
| TOP BUDA (Buda) | 8,805 ft | -8,456 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 8,360–8,370 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 9.625" | 1,590 ft | 850 sx |
| 2.375" | 8,258 ft | — |
| 5.5" | 8,734 ft | 2,120 sx |
Permit History (1)
Applications (1)
Records & Logs
4 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet