42-041-30694
Final CompletionWHEELER OIL UNIT #1
BRAZOS County · District 3 · MCZ INC. · KURTEN (GEORGETOWN)
Permits
1
Max Depth
9,120 ft
First Permit
1981-12-08
Latest Activity
1981-12-08
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1982-02-26
Shut-In
—
Plugged
2001-04-18
EWA / Production operator mismatch
Scheduling: MCZ INC. ≠ Production: B.W.O.C., INC. (reported 2002-06)
Resolved via: scheduling → MCZ INC.
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-07
Injection / Disposal
Permitted Volume
6,000 bbl/d
Max Pressure
4,000 psi
Injection Interval
8,168–8,178 ft
Injected (12mo)
—
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (4) Elevation 283 ft (KB)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| AUSTIN CHALK | 7,817 ft | -7,534 ft |
| WOODBINE | 8,168 ft | -7,885 ft |
| BUDA | 8,677 ft | -8,394 ft |
| GEORGETOWN | 8,780 ft | -8,497 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (2)
| Interval | Type |
|---|---|
| 8,168–8,178 ft | Perforated |
| 8,808–8,920 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 9.625" | 3,750 ft | 1,850 sx |
| 5.5" | 8,671 ft | 870 sx |
Permit History (1)
Applications (1)
Records & Logs
6 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet