42-041-30994

Final Completion

WILLIAMS D.W.

BRAZOS County · District 3 · CHAMPLIN PETROLEUM CO. · KURTEN (BUDA)

Permits

1

Max Depth

8,500 ft

First Permit

1983-08-08

Latest Activity

1983-08-08

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1983-10-14

Shut-In

Plugged

1984-04-20

Formation Tops (4) Elevation 334 ft (GR)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
AUSTIN CHALK 7,102 ft-6,768 ft
FALSE BUDA8,022 ft-7,688 ft
BUDA 8,060 ft-7,726 ft
GEORGETOWN 8,155 ft-7,821 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (2)

IntervalType
8,066–8,116 ftPerforated
8,210–8,290 ftPerforated

Casing (2)

SizeSet DepthCement
9.625"3,410 ft1,335 sx
5.5"8,440 ft595 sx

Permit History (1)

Applications (1)

#204658 A CHAMPLIN PETROLEUM CO.
received 1983-08-08

Records & Logs

2 completion filings on record.

W-2/G-1 1983-12-13
W-2/G-1 1983-12-13

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in BRAZOS County.

Well Details

Well Number
1
Max Depth
8,500 ft
Drill Type
Vertical
County
BRAZOS
District
3
Completed
1983-10-14

Operator

Location
HOUSTON
P-5 Status
Inactive (filed 1986-12-23)
Total Permits
1,006