42-041-31075

Final Completion

PETERS M.D.

BRAZOS County · District 3 · QUINOCO PETROLEUM INC. · KURTEN (BUDA)

Permits

1

Max Depth

9,500 ft

First Permit

1983-12-29

Latest Activity

1983-12-29

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-03-29

Shut-In

Plugged

1989-02-01

!

EWA / Permit operator mismatch

Scheduling: QUINOCO PETROLEUM INC. ≠ Permit: HILL INTERNATIONAL PRODUCTION CO

Resolved via: schedulingQUINOCO PETROLEUM INC.

Operator History

originally filed by HILL INTERNATIONAL PRODUCTION CO — asset transferred

Formation Tops (5) Elevation 328 ft (GR)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
AUSTIN CHALK 7,438 ft-7,110 ft
WOODBINE EAGLE FORD (Woodbine)7,748 ft-7,420 ft
BUDA 8,287 ft-7,959 ft
DEL RIO 8,406 ft-8,078 ft
GEORGE TOWN8,423 ft-8,095 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (1)

IntervalType
8,323–8,399 ftPerforated

Casing (2)

SizeSet DepthCement
9.625"3,515 ft1,049 sx
4.5"8,690 ft750 sx

Permit History (1)

Applications (1)

#225263 A HILL INTERNATIONAL PRODUCTION CO
received 1983-12-29

Records & Logs

2 completion filings on record.

W-2/G-1 1984-04-04
W-2/G-1 1984-04-04

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in BRAZOS County.

Well Details

Well Number
2
Max Depth
9,500 ft
Drill Type
Vertical
County
BRAZOS
District
3
Completed
1984-03-29

Operator

Location
MIDLAND
P-5 Status
Inactive (filed 1990-01-26)
Total Permits
28