42-049-30922
Final CompletionSPENCE A.P.
BROWN County · District 7 · BRITTANY DRILLING CO. · BROWN COUNTY REGULAR
Permits
1
Max Depth
2,256 ft
First Permit
1996-08-14
Latest Activity
1996-08-14
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1976-06-23
Shut-In
—
Plugged
—
!
EWA / Production operator mismatch
Scheduling: BRITTANY DRILLING CO. ≠ Production: 3 S PRODUCTION, INC. (reported 2025-12)
Resolved via: production → 3 S PRODUCTION, INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#451426 A BRITTANY DRILLING CO.
received 1996-08-12
Well Details
- Well Number
- 1
- Max Depth
- 2,256 ft
- Drill Type
- Vertical
- County
- BROWN
- District
- 7
- Operator
- BRITTANY DRILLING CO.
- Completed
- 1976-06-23
Operator
- Name
- BRITTANY DRILLING CO
- Location
- ABILENE
- P-5 Status
- Y (filed 2000-11-03)
- Cum Oil (all leases)
- 113,814 bbl
- Cum Gas (all leases)
- 826 mcf
- Total Permits
- 122