Permits
1
Max Depth
2,500 ft
First Permit
1983-03-15
Latest Activity
1983-03-15
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1983-03-29
Shut-In
—
Plugged
2026-03-05
EWA / Permit operator mismatch
Scheduling: REACH OIL ≠ Permit: TRI-TEX PETROLEUM CORPORATION
Resolved via: scheduling → REACH OIL
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (1) Elevation 1,492 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| MARBLE FALLS | 2,295 ft | -803 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 2,340–2,360 ft | Perforated |
Casing (5)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 160 ft | 100 sx |
| 8.625" | 160 ft | 100 sx |
| 2.375" | 2,330 ft | — |
| 4.5" | 2,460 ft | 500 sx |
| 4.5" | 2,510 ft | 500 sx |
Permit History (1)
Applications (1)
Records & Logs
5 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
Operator
- Name
- REACH OIL
- Location
- BROWNWOOD
- P-5 Status
- Active (filed 2025-07-25)
- Cum Oil (all leases)
- 11,650 bbl
- Cum Gas (all leases)
- 54,486 mcf
- Activities
- OPRS/G, OPRS/O
- Total Permits
- 1