42-049-34432

Final Completion

BARTHOLOMEW ET AL

BROWN County · District 7 · HAYNES PRODUCTION COMPANY INC. · JENAE (MISS.)

Permits

1

Max Depth

1,990 ft

First Permit

1985-07-31

Latest Activity

1985-07-31

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1985-08-09

Shut-In

Plugged

1986-10-03

Formation Tops (4)

CSV
FormationTop Depth (MD)
CADDO 1,162 ft
MARBLE FALLS 1,350 ft
BARNETT SHALE (Barnett)1,530 ft
MISS. (Mississippian)1,570 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. View filings & logs at RRC ↗

Perforations (2)

IntervalType
1,570–1,577 ftPerforated
1,582–1,585 ftPerforated

Casing (1)

SizeSet DepthCement
4.5"1,644 ft230 sx

Permit History (1)

Applications (1)

#281505 A HAYNES PRODUCTION COMPANY, INC.
received 1985-07-24

Records & Logs

2 completion filings on record.

W-2/G-1 1985-08-16
W-2/G-1 1985-09-12

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in BROWN County.

Well Details

Well Number
1
Max Depth
1,990 ft
Drill Type
Vertical
County
BROWN
District
7
Completed
1985-08-09

Operator

Location
BROWNWOOD
P-5 Status
Inactive (filed 2006-04-11)
Cum Oil (all leases)
863 bbl
Cum Gas (all leases)
1,369,769 mcf
Total Permits
27