Permits
2
Max Depth
10,000 ft
First Permit
1980-09-23
Latest Activity
1982-07-21
Lifespan
2 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
—
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops
No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.
Perforations (1)
| Interval | Type |
|---|---|
| 8,799–9,040 ft | Perforated |
Casing (4)
| Size | Set Depth | Cement |
|---|---|---|
| 16" | 40 ft | — |
| 9.625" | 4,140 ft | 1,050 sx |
| 2.875" | 8,720 ft | — |
| 5.5" | 9,495 ft | 570 sx |
Permit History (2)
Applications (2)
Records & Logs
1 completion filing on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet