42-051-32070
Final CompletionTRUELOVE UNIT
BURLESON County · District 3 · ITR PETROLEUM INC. · GIDDINGS (AUSTIN CHALK-3)
Permits
2
Max Depth
9,700 ft
First Permit
1981-10-07
Latest Activity
1985-05-21
Lifespan
4 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1981-12-12
Shut-In
—
Plugged
1992-11-06
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1993-02
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (2) Elevation 281 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| BIG "A" TAYLOR | 7,175 ft | -6,894 ft |
| AUSTIN CHALK-3 (Austin Chalk) | 9,290 ft | -9,009 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (2)
| Interval | Type |
|---|---|
| 7,175–7,190 ft | Perforated |
| 9,307–9,503 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 4,038 ft | 1,210 sx |
| 2.375" | 9,250 ft | — |
| 4.5" | 9,634 ft | 380 sx |
Permit History (2)
Applications (2)
Records & Logs
3 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 9,700 ft
- Drill Type
- Vertical
- County
- BURLESON
- District
- 3
- Operator
- ITR PETROLEUM INC.
- Completed
- 1981-12-12
Operator
- Name
- ITR PETRO, INC
- Location
- HOUSTON
- P-5 Status
- Inactive (filed 1987-05-12)
- Total Permits
- 44