42-055-34450
Final CompletionHYATT
CALDWELL County · District 1 · HYATT RICKY E. · PLUM CREEK (SERPENTINE)
Permits
1
Max Depth
1,800 ft
First Permit
1989-06-29
Latest Activity
1989-06-29
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1989-07-13
Shut-In
—
Plugged
2016-08-02
EWA / Permit operator mismatch
Scheduling: HYATT RICKY E. ≠ Permit: CACTUS PETROLEUM, INC.
Resolved via: scheduling → HYATT RICKY E.
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-07
Operator History
originally filed by CACTUS PETROLEUM, INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (3)
CSV| Formation | Top Depth (MD) |
|---|---|
| SURFACE TO DALE | 1,520 ft |
| SERPENTINE | 1,525 ft |
| AUSTIN CHALK | 1,580 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 1,525–1,545 ft | Perforated |
Casing (1)
| Size | Set Depth | Cement |
|---|---|---|
| 4.5" | 1,719 ft | 288 sx |
Permit History (1)
Applications (1)
Records & Logs
2 completion filings on record · 1 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 1,800 ft
- Drill Type
- Vertical
- County
- CALDWELL
- District
- 1
- Operator
- HYATT RICKY E.
- Completed
- 1989-07-13
Operator
- Name
- HYATT, RICKY E.
- Location
- AUSTIN
- P-5 Status
- Inactive (filed 2001-11-20)
- Cum Oil (all leases)
- 157 bbl
- Cum Gas (all leases)
- — mcf