42-057-30944
Final CompletionSCOTT P. ET AL
CALHOUN County · District 2 · GOLDKING PROD. CO. · PORT LAVACA (6100)
Permits
1
Max Depth
6,300 ft
First Permit
1979-10-05
Latest Activity
1979-10-05
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1979-11-25
Shut-In
—
Plugged
1983-04-20
EWA / Permit operator mismatch
Scheduling: GOLDKING PROD. CO. ≠ Permit: DELTA AMERICAN OIL CO.
Resolved via: scheduling → GOLDKING PROD. CO.
Operator History
originally filed by DELTA AMERICAN OIL CO. — asset transferred
Formation Tops
No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.
Perforations (2)
| Interval | Type |
|---|---|
| 6,106–6,112 ft | Perforated |
| 6,223–6,227 ft | Perforated |
Casing (6)
| Size | Set Depth | Cement |
|---|---|---|
| 8.833" | 460 ft | 330 sx |
| 8.625" | 460 ft | 330 sx |
| 2.375" | 6,093 ft | — |
| 2.375" | 6,145 ft | — |
| 7.875" | 6,313 ft | 350 sx |
| 2.875" | 6,313 ft | 350 sx |
Permit History (1)
Applications (1)
Records & Logs
2 completion filings on record · 1 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 6,300 ft
- Drill Type
- Vertical
- County
- CALHOUN
- District
- 2
- Operator
- GOLDKING PROD. CO.
- Completed
- 1979-11-25
Operator
- Name
- GOLDKING PROD. CO
- Location
- HOUSTON
- P-5 Status
- Inactive (filed 1997-09-18)
- Cum Oil (all leases)
- 296,912 bbl
- Cum Gas (all leases)
- 3,257,846 mcf
- Total Permits
- 692