Permits
1
Max Depth
2,100 ft
First Permit
1978-10-30
Latest Activity
1978-10-30
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1984-02-10
Shut-In
—
Plugged
1987-09-04
Injection / Disposal
H-1 Injection Plugged 1987-10-01 UIC #000049436 permitted 1983-09-29
Permitted Volume
—
Max Pressure
—
Injection Interval
—
Injected (12mo)
—
Formation Tops (6) Elevation 1,877 ft
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| B/COLEMAN JUNCTION | 1,094 ft | +783 ft |
| DOTHAN | 1,371 ft | +506 ft |
| SADDLE CREEK | 1,700 ft | +177 ft |
| FLIPPEN | 1,749 ft | +128 ft |
| CRYSTALL FALLS | 1,809 ft | +68 ft |
| COOK SAND | 1,829 ft | +48 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 1,750–1,754 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 102 ft | 85 sx |
| 2.375" | 1,747 ft | — |
| 4.5" | 2,039 ft | 325 sx |
Permit History (1)
Applications (1)
#35869 A DAVIS BROTHERS
received 1978-10-30
Records & Logs
2 completion filings on record.
W-2/G-1 1984-02-21
W-2/G-1 1984-02-21
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in CALLAHAN County.
Well Details
- Well Number
- 1
- Max Depth
- 2,100 ft
- Drill Type
- Vertical
- County
- CALLAHAN
- District
- 7
- Operator
- DAVIS BROTHERS
- Completed
- 1984-02-10
Operator
- Name
- DAVIS BROTHERS
- Location
- ABILENE
- P-5 Status
- Inactive (filed 1992-02-19)
- Total Permits
- 311