42-059-32251

Final Completion

YARBROUGH J.A.

CALLAHAN County · District 7 · PICKETT J. D. · PUTNAM NE (CONGLOMERATE)

Permits

1

Max Depth

4,400 ft

First Permit

1979-05-23

Latest Activity

1979-05-23

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-08-27

Shut-In

Plugged

1983-03-24

!

EWA / Permit operator mismatch

Scheduling: PICKETT J. D. ≠ Permit: PANTEGO PETROLEUM CO.

Resolved via: schedulingPICKETT J. D.

Operator History

originally filed by PANTEGO PETROLEUM CO. — asset transferred

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
3,685–3,726 ftPerforated

Casing (3)

SizeSet DepthCement
8.625"100 ft90 sx
2.375"3,680 ft
4.5"4,080 ft270 sx

Permit History (1)

Applications (1)

#49010 A PANTEGO PETROLEUM CO.
received 1979-05-23

Records & Logs

1 completion filing on record.

W-2/G-1 1979-10-05

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in CALLAHAN County.

Well Details

Well Number
1
Max Depth
4,400 ft
Drill Type
Vertical
County
CALLAHAN
District
7
Operator
PICKETT J. D.
Completed
1979-08-27

Operator

Location
MESQUITE
P-5 Status
Inactive (filed 1991-07-30)
Total Permits
8