42-059-33930
Final CompletionWINDHAM
CALLAHAN County · District 7 · NUEVE OPERATING CO. OF TEXAS · LAURA MAE HILL (ELLENBURGER)
Permits
1
Max Depth
4,399 ft
First Permit
1982-09-29
Latest Activity
1982-09-29
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1982-10-18
Shut-In
—
Plugged
1986-02-04
Formation Tops (6) Elevation 1,917 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| HOME CREEK | 2,195 ft | -278 ft |
| CROSSCUT SAND | 2,850 ft | -933 ft |
| GARDNER | 3,514 ft | -1,597 ft |
| CADDO | 3,750 ft | -1,833 ft |
| MISS. (Mississippian) | 4,306 ft | -2,389 ft |
| ELLENBURGER | 4,366 ft | -2,449 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 4,370–4,399 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 132 ft | 100 sx |
| 4.5" | 4,370 ft | 250 sx |
| 2.375" | 4,375 ft | — |
Permit History (1)
Applications (2)
#173190 A NUEVE OPERATING CO. OF TEXAS
received 1985-06-12
#173190 A LECLAIR OPERATING CO., INC.
received 1982-09-29
Records & Logs
3 completion filings on record.
W-2/G-1 1985-05-30
W-2/G-1 1985-06-26
W-2/G-1 1982-12-09
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in CALLAHAN County.
Well Details
- Well Number
- 3
- Max Depth
- 4,399 ft
- Drill Type
- Vertical
- County
- CALLAHAN
- District
- 7
- Operator
- NUEVE OPERATING CO. OF TEXAS
- Completed
- 1982-10-18
Operator
- Location
- ABILENE
- P-5 Status
- Inactive (filed 1985-06-21)
- Total Permits
- 286