42-059-34252
Final CompletionHART-WARREN UNIT
CALLAHAN County · District 7 · RICHEY & COMPANY INC. · CALLAHAN COUNTY REGULAR
Permits
1
Max Depth
2,200 ft
First Permit
1983-06-27
Latest Activity
1983-06-27
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1983-09-20
Shut-In
—
Plugged
1986-04-22
EWA / Permit operator mismatch
Scheduling: RICHEY & COMPANY INC. ≠ Permit: THOMAS-POWELL ROYALTY, INC.
Resolved via: scheduling → RICHEY & COMPANY INC.
Operator History
originally filed by THOMAS-POWELL ROYALTY, INC. — asset transferred
Formation Tops
No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.
Perforations (1)
| Interval | Type |
|---|---|
| 2,082–2,091 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 121 ft | 85 sx |
| 2.875" | 1,091 ft | — |
| 4.5" | 2,162 ft | 480 sx |
Permit History (1)
Applications (1)
Records & Logs
1 completion filing on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 5
- Max Depth
- 2,200 ft
- Drill Type
- Vertical
- County
- CALLAHAN
- District
- 7
- Operator
- RICHEY & COMPANY INC.
- Completed
- 1983-09-20
Operator
- Name
- RICHEY & CO, INC
- Location
- FORT WORTH
- P-5 Status
- Inactive (filed 1988-10-28)
- Total Permits
- 142