42-059-34938
Final CompletionPARROTT JOHNNY R.
CALLAHAN County · District 7 · SMITH PIPE OF ABILENE · STONE (CROSS PLAINS)
Permits
1
Max Depth
2,600 ft
First Permit
1984-05-07
Latest Activity
1984-05-07
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-07-19
Shut-In
—
Plugged
1995-02-14
EWA / Production operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Production: L.C.S. PRODUCTION COMPANY (reported 1993-09)
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: SPENCER PETROLEUM CO.
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2003-08
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (3)
CSV| Formation | Top Depth (MD) |
|---|---|
| WINCHELL | 2,140 ft |
| PALO PINTO | 2,430 ft |
| CROSS PLAINS | 2,455 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 2,358–2,362 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 142 ft | 95 sx |
| 4.5" | 2,552 ft | 130 sx |
Permit History (1)
Applications (1)
Records & Logs
3 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 4
- Max Depth
- 2,600 ft
- Drill Type
- Vertical
- County
- CALLAHAN
- District
- 7
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1985-07-19
Operator
- Location
- ABILENE
- P-5 Status
- Inactive (filed 2014-08-29)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf