42-059-34938

Final Completion

PARROTT JOHNNY R.

CALLAHAN County · District 7 · SMITH PIPE OF ABILENE · STONE (CROSS PLAINS)

Permits

1

Max Depth

2,600 ft

First Permit

1984-05-07

Latest Activity

1984-05-07

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1985-07-19

Shut-In

Plugged

1995-02-14

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: L.C.S. PRODUCTION COMPANY (reported 1993-09)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: SPENCER PETROLEUM CO.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2003-08

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (3)

CSV
FormationTop Depth (MD)
WINCHELL2,140 ft
PALO PINTO 2,430 ft
CROSS PLAINS2,455 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. View filings & logs at RRC ↗

Perforations (1)

IntervalType
2,358–2,362 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"142 ft95 sx
4.5"2,552 ft130 sx

Permit History (1)

Applications (1)

#238027 A SPENCER PETROLEUM CO.
received 1984-05-07

Records & Logs

3 completion filings on record.

W-2/G-1 1985-10-14
W-2/G-1 1984-05-29
W-2/G-1 1984-05-29

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in CALLAHAN County.

Well Details

Well Number
4
Max Depth
2,600 ft
Drill Type
Vertical
County
CALLAHAN
District
7
Completed
1985-07-19

Operator

Location
ABILENE
P-5 Status
Inactive (filed 2014-08-29)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf