42-059-34972

Final Completion

JOHNSON

CALLAHAN County · District 7 · WESTWIND EXPLORATION INC. · STONE (CROSS PLAINS)

Permits

1

Max Depth

4,300 ft

First Permit

1984-06-05

Latest Activity

1984-06-05

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-06-18

Shut-In

Plugged

1985-12-07

Formation Tops (4)

CSV
FormationTop Depth (MD)
T/CROSS PLAINS2,358 ft
T/PALO PINTO2,428 ft
T/CADDO3,388 ft
T/ELLENBURGER4,086 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. View filings & logs at RRC ↗

Perforations (1)

IntervalType
2,358–2,362 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"135 ft90 sx
4.5"4,130 ft200 sx

Permit History (1)

Applications (1)

#241190 A WESTWIND EXPLORATION, INC.
received 1984-06-05

Records & Logs

2 completion filings on record.

W-2/G-1 1984-07-18
W-2/G-1 1984-07-18

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in CALLAHAN County.

Well Details

Well Number
1
Max Depth
4,300 ft
Drill Type
Vertical
County
CALLAHAN
District
7
Completed
1984-06-18

Operator

Location
ABILENE
P-5 Status
Inactive (filed 1985-11-07)
Total Permits
56