42-059-35202
Final CompletionRAY
CALLAHAN County · District 7 · CROWN EXPLORATION COMPANY · PUTNAM SOUTH (CADDO LIME)
Permits
1
Max Depth
4,400 ft
First Permit
1984-12-05
Latest Activity
1984-12-05
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-04-01
Shut-In
—
Plugged
1986-02-18
Formation Tops (3) Elevation 1,722 ft (KB)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| CADDO LIME (Caddo) | 3,359 ft | -1,637 ft |
| DUFFER | 3,927 ft | -2,205 ft |
| ELLENBURGER | 4,097 ft | -2,375 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 3,360–3,363 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 226 ft | 150 sx |
| 4.5" | 4,084 ft | 250 sx |
Permit History (1)
Applications (1)
#259927 A CROWN EXPLORATION COMPANY
received 1984-12-03
Records & Logs
2 completion filings on record.
W-2/G-1 1985-04-12
W-2/G-1 1985-06-12
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in CALLAHAN County.
Well Details
- Well Number
- 1
- Max Depth
- 4,400 ft
- Drill Type
- Vertical
- County
- CALLAHAN
- District
- 7
- Operator
- CROWN EXPLORATION COMPANY
- Completed
- 1985-04-01
Operator
- Name
- CROWN EXPL CO
- Location
- ABILENE
- P-5 Status
- Inactive (filed 1995-01-26)
- Total Permits
- 135