42-059-36407

Final Completion

ANTILLEY UNIT

CALLAHAN County · District 7 · STAR PRODUCTION INC. · BIG EASY (PALO PINTO)

Permits

1

Max Depth

5,000 ft

First Permit

1996-05-02

Latest Activity

1996-05-02

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1996-06-26

Shut-In

Plugged

1997-06-12

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1996-06

Last Production

1997-08

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
3,181–3,188 ftPerforated

Casing (3)

SizeSet DepthCement
8.625"180 ft115 sx
5.5"4,642 ft125 sx
5.5"125 sx

Permit History (1)

Applications (1)

#447714 A STAR PRODUCTION, INC.
received 1996-05-02

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 1996-07-25 log on file
W-2/G-1 1996-08-01

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in CALLAHAN County.

Well Details

Well Number
1
Max Depth
5,000 ft
Drill Type
Vertical
County
CALLAHAN
District
7
Completed
1996-06-26

Operator

Location
DALLAS
P-5 Status
Active (filed 2026-03-17)
Cum Oil (all leases)
3,238,673 bbl
Cum Gas (all leases)
1,600,946 mcf
Activities
OPRS/G, OPRS/O
Total Permits
191