42-065-30794

Final Completion

CULVER C. L.

CARSON County · District 10 · CAPROCK ENGINEERING INC. · PANHANDLE WEST

Permits

1

Max Depth

3,200 ft

First Permit

1980-05-01

Latest Activity

1980-05-01

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1980-08-15

Shut-In

—

Plugged

2017-01-09

!

EWA / Permit operator mismatch

Scheduling: CAPROCK ENGINEERING INC. ≠ Permit: FARRELL, ROY JR.

Resolved via: scheduling → CAPROCK ENGINEERING INC.

Production Summary

Cum Oil

— bbl

Cum Gas

— mcf

First Production

1993-01

Last Production

2017-01

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
2,918–2,948 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"576 ft330 sx
4.5"3,043 ft100 sx

Permit History (1)

Applications (1)

#79991 A FARRELL, ROY JR.
received 1980-05-01

Records & Logs

1 completion filing on record.

W-2/G-1 1980-10-09

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in CARSON County.

Well Details

Well Number
1A
Max Depth
3,200 ft
Drill Type
Vertical
County
CARSON
District
10
Completed
1980-08-15

Operator

Location
PAMPA
P-5 Status
Inactive (filed 2017-08-08)
Cum Oil (all leases)
82,305 bbl
Cum Gas (all leases)
5,444,852 mcf
Total Permits
48