42-071-31868

Final Completion

HANKAMER E.C.

CHAMBERS County · District 3 · BAGLEY ROY · STOWELL (6500)

RRC Lookup

Permits

2

Max Depth

9,500 ft

First Permit

1988-05-27

Latest Activity

1998-05-04

Lifespan

10 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1988-07-09

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: BAGLEY ROY ≠ Production: SAWTOOTH OPERATING CO., INC. (reported 2024-08)

Resolved via: schedulingBAGLEY ROY

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#475909 A BAGLEY, ROY
received 1998-05-04
#347116 A SOLATEX RESOURCES, LTD
received 1988-05-27

Well Details

Well Number
3
Max Depth
9,500 ft
Drill Type
Vertical
County
CHAMBERS
District
3
Operator
BAGLEY ROY
Completed
1988-07-09

Operator

Location
MAGNOLIA
P-5 Status
Y (filed 2026-03-04)
Cum Oil (all leases)
198,241 bbl
Cum Gas (all leases)
58,887 mcf
Activities
OPRS/G
Total Permits
6

External Links

Live © 2026 Petrora