42-073-30656
Final CompletionGOODSON
CHEROKEE County · District 6 · SIMOR OPERATING INC. · MITCHELL-STARK (JAMES LIME)
Permits
1
Max Depth
9,700 ft
First Permit
1985-06-13
Latest Activity
1985-06-13
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-11-08
Shut-In
—
Plugged
1987-12-08
Formation Tops (6) Elevation 444 ft (GL)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| BASE AUSTIN CHALK (Austin Chalk) | 4,670 ft | -4,226 ft |
| B/AUSTIN CHALK | 4,670 ft | -4,226 ft |
| T/GLEN ROSE | 6,816 ft | -6,372 ft |
| T/MASSIVE ANHYD | 8,273 ft | -7,829 ft |
| T/MASSIVE ANKYD | 8,273 ft | -7,829 ft |
| T/TRAVIS PEAK | 9,461 ft | -9,017 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 9,040–9,076 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 2,500 ft | 960 sx |
| 5.5" | 9,700 ft | 880 sx |
Permit History (1)
Applications (1)
Records & Logs
4 completion filings on record · 1 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 9,700 ft
- Drill Type
- Vertical
- County
- CHEROKEE
- District
- 6
- Operator
- SIMOR OPERATING INC.
- Completed
- 1985-11-08
Operator
- Name
- SIMOR OPER, INC
- Location
- TYLER
- P-5 Status
- Inactive (filed 1988-03-24)
- Total Permits
- 10