Permits
1
Max Depth
6,800 ft
First Permit
1984-03-08
Latest Activity
1984-03-08
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1984-04-27
Shut-In
—
Plugged
1985-09-28
Formation Tops (3) Elevation 1,062 ft (KB)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| CADDO LIME (Caddo) | 5,742 ft | -4,680 ft |
| BARNETT | 6,200 ft | -5,138 ft |
| ELLENBURGER | 6,498 ft | -5,436 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 5,925–5,954 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 261 ft | 230 sx |
| 4.5" | 6,086 ft | 350 sx |
Permit History (1)
Applications (1)
#231885 A HARPER, WAYNE
received 1984-03-07
Records & Logs
2 completion filings on record.
W-2/G-1 1984-05-17
W-2/G-1 1984-05-17
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in CLAY County.
Well Details
- Well Number
- 1
- Max Depth
- 6,800 ft
- Drill Type
- Vertical
- County
- CLAY
- District
- 9
- Operator
- HARPER WAYNE
- Completed
- 1984-04-27
Operator
- Name
- HARPER, WAYNE
- Location
- DALLAS
- P-5 Status
- Inactive (filed 2010-03-09)
- Cum Oil (all leases)
- 1,700,635 bbl
- Cum Gas (all leases)
- 1,325,511 mcf
- Total Permits
- 171