42-077-34065
Final CompletionFLEMING-DELTA
CLAY County · District 9 · STORM OIL · CLAY COUNTY REGULAR
Permits
1
Max Depth
1,500 ft
First Permit
1986-08-27
Latest Activity
1986-08-27
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1987-03-27
Shut-In
—
Plugged
2002-05-14
EWA / Permit operator mismatch
Scheduling: STORM OIL ≠ Permit: KEEN OIL COMPANY
Resolved via: scheduling → STORM OIL
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-07
Injection / Disposal
Permitted Volume
250 bbl/d
Max Pressure
550 psi
Injection Interval
1,156–1,171 ft
Injected (12mo)
—
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (1) Elevation 965 ft
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| THOMAS SAND | 1,152 ft | -187 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 1,156–1,171 ft | Perforated |
Casing (1)
| Size | Set Depth | Cement |
|---|---|---|
| 4.5" | 1,223 ft | 145 sx |
Permit History (1)
Applications (1)
Records & Logs
2 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet