42-089-00573

PLOW REALTY CO.

COLORADO County · District 3 · EP OPERATING COMPANY

Permits

1

Max Depth

9,185 ft

First Permit

1992-03-12

Latest Activity

1992-03-12

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-07

Injection / Disposal

H-1 Injection Plugged 2020-02-21 UIC #000084698 permitted 1996-05-31

Permitted Volume

2,800 bbl/d

Max Pressure

2,500 psi

Injection Interval

9,044–9,160 ft

Injected (12mo)

Monthly injected volume (bbl, from H-10 filings through 2020-05-01)

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (3) Elevation 215 ft

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
WILCOX 8,140 ft-7,925 ft
WILCOX G (Wilcox)9,063 ft-8,848 ft
WILCOX H (Wilcox)9,120 ft-8,905 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (3)

IntervalType
9,060–9,080 ftPerforated
9,120–9,146 ftPerforated
?–9,155 ftPerforated

Casing (2)

SizeSet DepthCement
10.75"1,990 ft982 sx
5.5"9,188 ft250 sx

Permit History (1)

Applications (1)

#396888 A EP OPERATING COMPANY
received 1992-03-09

Records & Logs

2 completion filings on record.

W-2/G-1 1998-07-03
W-2/G-1 1984-01-12

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in COLORADO County.

Well Details

Well Number
2
Max Depth
9,185 ft
Drill Type
Vertical
County
COLORADO
District
3

Operator

Location
DALLAS
P-5 Status
Inactive (filed 1992-03-26)
Total Permits
568