42-089-30341
Final CompletionBURT-STEIN
COLORADO County · District 3 · ATAPCO · GLIDDEN (WILCOX 9970)
Permits
1
Max Depth
10,500 ft
First Permit
1981-12-31
Latest Activity
1981-12-31
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1975-01-25
Shut-In
—
Plugged
1977-04-26
EWA / Permit operator mismatch
Scheduling: ATAPCO ≠ Permit: SMITH, JOE E.
Resolved via: scheduling → ATAPCO
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1995-09
Operator History
originally filed by SMITH, JOE E. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (2) Elevation 328 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| YEGUA | 3,785 ft | -3,457 ft |
| WILCOX | 6,620 ft | -6,292 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (3)
| Interval | Type |
|---|---|
| 9,396–9,612 ft | Perforated |
| 9,647–9,662 ft | Perforated |
| 9,968–9,982 ft | Perforated |
Casing (5)
| Size | Set Depth | Cement |
|---|---|---|
| 10.75" | 1,605 ft | 930 sx |
| 10.75" | 1,630 ft | — |
| 2.375" | 9,282 ft | — |
| 5.5" | 10,487 ft | — |
| 5.5" | 10,488 ft | 1,150 sx |
Permit History (1)
Applications (1)
Records & Logs
3 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet