42-089-32467
TEMP ABANDONEDWIED
COLORADO County · District 3 · ALLTEX OPERATING COMPANY · LYDIA (4100)
Permits
2
Max Depth
4,600 ft
First Permit
2006-03-06
Latest Activity
2006-03-06
Lifespan
< 1 yr
Regulatory Status
Schedule
ON SCHEDULE
Completion
2007-05-14
Shut-In
—
Plugged
—
P-5 Org Status: Delinquent
EWA / Permit operator mismatch
Scheduling: ALLTEX OPERATING COMPANY ≠ Permit: NEW CENTURY EXPLORATION, INC.
Resolved via: scheduling → ALLTEX OPERATING COMPANY
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2007-05
Last Production
2026-07
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops
No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.
Perforations (1)
| Interval | Type |
|---|---|
| 3,791–3,797 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 475 ft | 206 sx |
| 4.5" | 4,014 ft | 680 sx |
Permit History (2)
Applications (2)
Records & Logs
2 completion filings on record · 1 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 4,600 ft
- Drill Type
- Vertical
- County
- COLORADO
- District
- 3
- Operator
- ALLTEX OPERATING COMPANY
- Completed
- 2007-05-14
Operator
- Location
- LULING
- P-5 Status
- Delinquent (filed 2025-05-29)
- Cum Oil (all leases)
- 1,546 bbl
- Cum Gas (all leases)
- 3,726 mcf
- Activities
- OPRS/G