42-095-30786
Final CompletionHOUSTON W. F. JR.
CONCHO County · District 7 · BROOKER O.R. · PAINT ROCK W. (GOEN D)
Permits
1
Max Depth
4,000 ft
First Permit
1984-11-20
Latest Activity
1984-11-20
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-05-21
Shut-In
—
Plugged
1986-07-16
EWA / Permit operator mismatch
Scheduling: BROOKER O.R. ≠ Permit: WESTERN CHIEF OIL & GAS COMPANY
Resolved via: scheduling → BROOKER O.R.
Operator History
originally filed by WESTERN CHIEF OIL & GAS COMPANY — asset transferred
Formation Tops (3) Elevation 1,678 ft
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| STRAWN | 3,210 ft | -1,532 ft |
| GOEN | 3,305 ft | -1,627 ft |
| ELLENBURGER | 3,630 ft | -1,952 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 3,417–3,433 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 107 ft | 60 sx |
| 4.5" | 3,971 ft | 250 sx |
Permit History (1)
Applications (1)
Records & Logs
2 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 4,000 ft
- Drill Type
- Vertical
- County
- CONCHO
- District
- 7
- Operator
- BROOKER O.R.
- Completed
- 1985-05-21
Operator
- Name
- BROOKER, O.R
- Location
- EL PASO
- P-5 Status
- Inactive (filed 1987-11-25)
- Total Permits
- 3