42-095-31528
Final CompletionKRIEG N.
CONCHO County · District 7 · LECLAIR OPERATING CO. INC. · GET IT (GOEN LIME)
Permits
5
Max Depth
4,000 ft
First Permit
1993-01-08
Latest Activity
2004-09-16
Lifespan
12 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1993-02-17
Shut-In
—
Plugged
2022-03-08
EWA / Production operator mismatch
Scheduling: LECLAIR OPERATING CO. INC. ≠ Production: CONCHO OILFIELD SERV & OPER CO. (reported 2018-10)
EWA / Permit operator mismatch
Scheduling: LECLAIR OPERATING CO. INC. ≠ Permit: TAHOE EXPLORATION INC.
Resolved via: scheduling → LECLAIR OPERATING CO. INC.
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-02
Last Production
2022-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (5) Elevation 2,112 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| B/D SADDLE CREEK | 1,650 ft | +462 ft |
| CROSS CUT | 2,920 ft | -808 ft |
| GOEN | 3,531 ft | -1,419 ft |
| GOEN LIME "D" | 3,531 ft | -1,419 ft |
| GOEN LIME ''D'' | 3,531 ft | -1,419 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (3)
| Interval | Type |
|---|---|
| 2,957–2,977 ft | Perforated |
| 3,531–3,540 ft | Perforated |
| 3,531–3,541 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 230 ft | 160 sx |
| 4.5" | 3,757 ft | 590 sx |
Permit History (5)
KRIEG · 3,757 ft
2004-09-16
KRIEG · 3,500 ft
2002-11-18
Spud 2002-10-01
KRIEG · 2,957 ft
2002-11-18
KRIEG, N. · 4,000 ft
1993-01-08
Spud 1993-01-19
KRIEG, N. · 4,000 ft
1993-01-08
Applications (5)
Records & Logs
6 completion filings on record · 3 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 2
- Max Depth
- 4,000 ft
- Drill Type
- Vertical
- County
- CONCHO
- District
- 7
- Operator
- LECLAIR OPERATING CO. INC.
- Completed
- 1993-02-17
Operator
- Location
- ABILENE
- P-5 Status
- Inactive (filed 2013-06-05)
- Cum Oil (all leases)
- 1,674,817 bbl
- Cum Gas (all leases)
- 8,238,505 mcf
- Total Permits
- 351